18650 rechargeable battery lithium 3.7v 3500mah
CH
About Us
Company Profile Development History Sales Network Partner Social Responsibility
Products
Rechargeable Battery Battery Packs Energy Storage Battery Primary Battery Handicraft Article
Subsidiary Company
SINO TECHNOLOGY SUNBEAM GREEN POWER DATAPOWER SEONG-HEE STD
Honor
Qualification Certificate Patent Certificate Honor Certificate
R&D
R&D Center Test Center
News
Company News Industry News
Contact Us
18650 rechargeable battery lithium 3.7v 3500mah
18650 rechargeable battery lithium 3.7v 3500mah

Other information

Home  >  Other information

3.7V lipo battery

release time:2024-04-07 Hits:     Popular:AG11 battery

  Switching 3.7V lipo battery manufacturing process detailed explanation by 3.7V lipo battery manufacturers

  First, prenatal BOM:

  For new orders, the engineering department must conduct an aging test on the 3.7V lipo battery in accordance with the standards, and then the quality department will conduct the final reliability aging and reliability test. After the quality is confirmed to be OK, the product and PCB board will be photographed and archived, and the reliability test report will be signed. The person in charge of the engineering project can sign the BOM based on the reliability report and photos, and then the head of the engineering department signs it to take effect. The sample will then be analyzed by the manufacturing engineer to determine the rationality of its production and processing, and the sample will be signed on the work instruction before it can be produced. For models with existing ERP BOM that have not been produced within two months, the engineering department must confirm again before production can be carried out. Models produced within two months can be produced directly. The engineering must provide more than two handpiece samples before each production. and PCB assembly.

  Second, the production department patch plug-in:

  Before patching the plug-in, there must be the original PCB sample provided by the project. Before patching the plug-in, the sample plug-in must be assembled according to the PCB. At the same time as the plug-in is being placed, QC must carefully check the correctness of the patch and plug-in. During the process After tinning, QC immediately makes 2 PC SPCB hand parts to confirm its electrical performance. If any abnormalities are found, the manufacturing engineering and R&D departments should be contacted as soon as possible. If the PCB hand parts are confirmed to be OK, the PCB assembly to the finished product will be quickly completed and aging testing will be performed.

  Third, repair welding:

  The repair welder performs follow-up repair welding on the bare board after the plug-in is completed, and checks the correctness of the plug-in. If there are a large number of tin connections, inverted pins, and false soldering, it should be reported to the plug-in puller in time. The repair welder also performs testing and maintenance on the bare board. , it is necessary to ensure that every PCB board sent to the assembly puller is OK, and the repair welding puller needs to be set to record the wrong parts of the plug-in puller, false welding and other irregular operations.

  Fourth, assembly

  The assembly manager is responsible for the subsequent processing of the PCB. After the wires are soldered and covered with a cover, the test is carried out. After the test, it is aged. After the aging is OK, the board is ultrasonicated, screwed, and finally tested again.


Read recommendations:

Lithium-ion battery GN200 222wh

The production process of lithium battery.button cell battery cr1620

Anti - seismic Lithium Batteries

3.2v 280ah lifepo4 battery cell

18650 battery pack 12v

Last article:Nickel Hydride No. 5 batteries

Next article:9v batteries

Popular recommendation

battery lifepo4 3.2v

2023-03-22

18650 battery rechargeable

2023-03-22

18650 battery pack 12v

2023-03-22

902030 battery wholesaler

2023-03-22

AA NiMH battery

2023-03-22

L1022 10A

2022-10-09

602030 300mAh 3.7V

2022-08-19

801538 480MAH 3.7V

2023-06-10

803040 1000mAh 3.7V

2022-06-27

Lithium Battery GN7250

2022-08-19

Ni-MH AAA700mAh 1.2V

2022-07-01

Ni-MH AA1200mAh 1.2Va

2022-07-01

R6P

2023-03-27

Li-ion 18650 3500mAh 3.7V

2022-06-20

LR14

2022-11-22

li ion 18650 battery pack maker

2023-06-25

18650 battery 3500mah

2023-06-25

NiMH No.7 battery

2023-06-25

18650 battery 3.7v 6000mah

2023-06-25

LR754 battery

2023-06-25

Energy density issues of new energy vehicle power batteries.18650 lithium battery cells

2023-09-22

Power type lithium battery and ordinary lithium battery difference

2024-03-13

Lithium battery development

2022-11-15

powerwall lifepo4 battery for solar system.New breakthrough in ternary lithium batteries - magazine

2023-11-22

home powerwall lithium ion battery.Precautions for using lithium batteries

2023-10-18

What are the reasons for the performance attenuation of lithium iron phosphate batteries in low temp

2023-03-28

How to deal with the ignition problem of lithium ion batteries?

2023-02-11

The battery maintenance of lithium battery manufacturers has the following points.lifepo4 battery fo

2023-03-28

Lithium battery dual -electronic reaction.lithium battery energy storage Manufacturing

2023-04-22

Correct maintenance methods for lead-acid batteries.18650 battery 3.7v 2000mah

2023-09-21
360° FACTORY VR TOUR
lithium ion battery 18650 priceWhatsapp
lithium ion battery 18650 price

lithium ion battery 18650 priceTel
+86 19925278095

lithium ion battery 18650 priceEmail
admin@sino-techgroup.com

TOP