18650 rechargeable battery lithium 3.7v 3500mah
CH
About Us
Company Profile Development History Sales Network Partner Social Responsibility
Products
Rechargeable Battery Battery Packs Energy Storage Battery Primary Battery Handicraft Article
Subsidiary Company
SINO TECHNOLOGY SUNBEAM GREEN POWER DATAPOWER SEONG-HEE STD
Honor
Qualification Certificate Patent Certificate Honor Certificate
R&D
R&D Center Test Center
News
Company News Industry News
Contact Us
18650 rechargeable battery lithium 3.7v 3500mah
18650 rechargeable battery lithium 3.7v 3500mah

Other information

Home  >  Other information

LR03 alkaline battery.A brief discussion on the installation and construction technology of photovoltaic power station components

release time:2024-03-06 Hits:     Popular:AG11 battery

  

  1. Preparation work before installation Construction preparation work is an important prerequisite to ensure the smooth construction of the project and the comprehensive completion of various indicators. It is a planned, step-by-step and staged work, not only before construction, but also throughout the construction. The whole process. Technology... Keywords: photovoltaic power station, photovoltaic module, solar array, array bracket.

  1. Preparations before installation

  Construction preparation is an important prerequisite to ensure the smooth construction of the project and the comprehensive completion of various indicators. It is a planned, step-by-step, and phased work, not only before construction, but also throughout the entire construction process.

  Technical preparations

  Be familiar with and review drawings. Drawings are the language of engineering and the basis for construction. Before starting work, construction personnel should first be familiar with the construction drawings; understand the design content and design drawings, clarify the equipment and materials used in the project, clarify the construction requirements proposed in the drawings, and the cross-cooperation between sub-projects, main projects, and other installation projects so as to ensure early completion of the project. Take measures to avoid location conflicts with other projects.

  Review the drawing content and materials, and prepare construction auxiliary materials based on site conditions (photos, measurement data).

  Review the main equipment and auxiliary materials; deepen the digestion and understanding of the drawings, and promptly provide reasonable suggestions to the designers if any discrepancies are found. If there is anything unclear, consult the design department in a timely manner so that there is no doubt in your mind. According to the project contract and design drawings, seize the time to organize personnel to make the following construction preparations:

  1. In the early stage of entering the site, carry out in-depth design of construction drawings, such as the pre-embedding stage, early installation stage, etc., and solve the problems existing in the drawing design and on-site.

  2. Draw the comprehensive layout of more complex points such as solar modules, bridges, junction boxes, inverters, etc. to avoid pipeline collisions and intersections during installation and construction, which will affect the construction quality and visual quality.

  3. Be familiar with the site, plan the general layout of the construction, and prepare the construction organization design or construction plan. Submit it to the supervisor and Party A for review to ensure the feasibility of the plan.

  4. Prepare material quantities and material plans based on the construction organization design and construction progress plan to ensure that the materials meet the construction progress requirements.

  5. Be familiar with other technical information related to the project, such as construction and acceptance specifications, technical regulations, quality inspection and assessment information, such as installation instructions, product certificates, test record data, etc.

  6. Prepare construction plan. On the basis of being fully familiar with the construction drawings, comprehensively make a reasonable construction plan based on the drawings and the construction site conditions, technical strength and technical equipment.

  The overall construction process flow of solar array:

  1. Cement pipe pile

  2. Assembling square array brackets

  3. Solar cell module installation

  4. Install the fixings between solar modules

  5. Overall adjustment to achieve horizontal and vertical alignment, even spacing, and overall beautiful appearance.

  6. Installation of DC combiner box

  7. DC combiner box or AC combiner box wiring

  8. Cable fixation

  4. Construction and installation process - piling and bracketing

  1. Measurement - line drawing - positioning - pile pressing - re-measurement

  2. Construction and installation process - bracket installation

  3. Measurement - fixation - welding of the main bracket - re-inspection - the bracket hoop is fixed on the cement pile - upper horizontal single - upper inclined beam - angle meter detection - upper purlin - tie bars (lower The picture shows whether the supervision retest angle is 32 degrees)

  4. Construction and installation process - solar module installation

  Wiring - installation of solar modules - fixation between solar modules - overall adjustment to achieve horizontal and vertical alignment, even spacing, and overall beauty.

  5. Installation and wiring of combiner box

  DC combiner box (or string inverter box, AC combiner box)

  Fix it on the cement pipe pile according to the size requirements of the drawing (tighten the bolts) - ground the box - series connection of the DC box group (the wire diameter and production meet the requirements of the specification) - seal the steel pipe diameter - fix the cable.

  5. Hidden projects - excavation of ground trenches and cable trenches

  Excavate 800mm wide × 700-1000mm deep according to the diagram - acceptance - welding of grounding bar (according to welding process) anti-corrosion of grounding bar - filling with soil (100mm) - placing cables - filling with soil (100mm) - placing 485 cables ——Acceptance before backfilling——Backfilling.

  6. Other requirements: Bolts (key points)

  1. The grade, specifications and quantity of bolts should be checked according to the design drawings and acceptance specifications, and used in a matching manner. Small ones should not be used instead of large ones.

  2. Bolts should be classified in marked containers to prevent misuse due to mixed placement of bolts.

  3. Keep records of bolts temporarily used for special reasons and replace them in time.

  4. When tightening bolts, the maximum torque should not be greater than 120% of the minimum tightening torque.

  5. Socket tools should be used to tighten bolts. The smoothness of the bottom of the nut should be checked and measures should be taken to prevent the screw from rotating.

  6. One bolt should have two flats and one spring; after tightening the screw, three to five teeth should be exposed.

  7. Strict responsibility system should be followed when tightening bolts, and a quality tracking system should be implemented.


Read recommendations:

18650 2000mAh 3.7V

What is the difference between the 26650 lithium battery and the 18650 lithium battery

Lead-acid batteries

Ni-MH battery packs manufacture

NiMH battery pack

Last article:LR03 battery.Research on power battery asset management operation model

Next article:lithium 3400mah 3.7v 18650 battery.How to implement a battery charger using lithium-ion technology?

Popular recommendation

portable energy storage battery manufacturer

2023-05-10

601848 battery wholesaler

2023-03-22

3.2v 320ah lifepo4 battery

2023-03-22

401030 battery Processing

2023-03-22

AA Ni-MH battery Factory

2023-03-22

18650 2500mAh 11.1V

2022-09-30

Ni-MH AA1500mAh 1.2V

2022-07-01

401030 90mAh 3.7V

2022-07-01

18650 2600mAh 3.7V

2022-08-19

Ni-MH AAA1000mAh 1.2V

2022-07-01

Plastic pet muzzle

2022-09-22

522749 880mAh 3.7V

2022-07-01

14500 850mAh 3.7V

2022-06-20

LR03

2022-11-22

18650 7500mAh 14.8V

2022-09-30

CR1225 battery

2023-06-25

3.7v battery 18650

2023-06-25

lithium 3400mah 3.7v 18650 battery

2023-06-25

18650 lithium ion battery

2023-06-25

18650 battery 3.7v 3500mah

2023-06-25

3.2v 300ah lifepo4 battery.Can polymer lithium batteries be shipped or not?

2023-11-08

CR2032 button cell battery.What are the advantages of polymer lithium batteries

2024-01-03

Preparation and requirements of Lithium carbonate battery raw materials.18650 battery 3.7v 2200mah

2023-08-03

So does the battery need to be activated

2024-04-23

Analysis of the Causes of Lithium Battery Charging Explosion.Nickel Hydride No. 5

2023-08-04

Impact of lithium battery value.18650 rechargeable battery lithium 3.7v 3500mah.18650 battery lithiu

2023-08-08

Advantages and disadvantages of lithium iron phosphate battery

2022-11-26

Why is the ternary lithium battery more suitable for household electric vehicles?

2023-02-08

Can high Lithium batteries reach a battery life of 600km?LR721 battery

2023-06-16

18650 battery 3.7v 1800mah.What are the advantages of lithium battery manufacturers

2023-10-12
360° FACTORY VR TOUR
lithium ion battery 18650 priceWhatsapp
lithium ion battery 18650 price

lithium ion battery 18650 priceTel
+86 19925278095

lithium ion battery 18650 priceEmail
admin@sino-techgroup.com

TOP